Skip to content
    Live webinar

    Join 350+ supply chain and operations leaders

    Critical Inbound: Controlling the Shipments That Stop the Line

    A panel with Orkestra and Evolution Time Critical on the inbound shipments that decide whether the line runs — and how leading automotive suppliers get ahead of them before a slip becomes a line-stop or an uncontrolled premium-freight bill.

    October 8, 20269:30 AM EST / 3:30 PM CET45 minutes + live Q&ALive panel + Q&A

    Save your spot

    Free · 45 minutes + live Q&A · recording sent to everyone who registers

    Calendar invite and access link arrive instantly. Can't make it live? Register anyway and we'll send the recording.

    On the panel

    Heiner Murmann

    Heiner Murmann

    Founder & CEO, Orkestra

    Former CEO Americas, DB Schenker

    Bruno P. Valeur

    Bruno P. Valeur

    Global Head of Sales, ETC

    Former Sales Director, sennder

    Siddharth Tripathi

    Siddharth Tripathi

    Head of Product, Orkestra

    Former Head of Analytics & BI, Forto

    Trusted by supply chain teams at

    MatalcoDLAOIA GlobalIllyKingsdownLevitt SafetySquareInstoreDBWMatalcoDLAOIA GlobalIllyKingsdownLevitt SafetySquareInstoreDBW

    Why attend

    It isn't your miss. It's still your problem.

    Automotive assembly line with industrial robots on the plant floor

    A sub-supplier misses. A carrier goes quiet. Your scorecard takes the hit, your line is hours from stopping, and your P&L absorbs a freight bill nobody approved.

    In 45 minutes we walk the strategy we run with automotive suppliers to control that response — and to prove who caused it.

    Why now

    Tariffs and re-sourcing are moving inbound onto new suppliers and unproven lanes — and every new lane is a new way for a critical part to slip. The teams getting ahead of it are building the control now, before the next launch or peak.

    What you'll take away

    • Why an inbound slip becomes your scorecard hit — regardless of fault
    • The anatomy of a real critical inbound: the slip, the scramble, the cost
    • Tracking vs. control — why seeing the delay isn't the same as stopping the line
    • PREVENT and DEFEND: coordinate the response, and charge back the party actually at fault

    Prevent

    Coordinate before the miss

    Defend

    Charge it back to the party at fault

    Who's behind it

    One company keeps the part from being late. The other moves it when it already is.

    Orkestra

    The control layer

    The supply chain command center. Orkestra sits above ERP, TMS and WMS and connects orders, shipments, inventory, partners and exceptions into one operational layer — so a slip surfaces early, against the plant's buffer, and the response is coordinated without replacing core systems.

    Evolution Time Critical

    The emergency move

    Time-critical logistics for automotive. When the clock has already run out, ETC executes the recovery — working across a network of 2,000+ OEMs and suppliers to get the part to the line before it stops.

    Most sessions give you one half of this. Prevention without anyone who has run the 3 a.m. recovery, or heroics without the system that would have made them unnecessary. This panel has both in the room.

    Built from real automotive inbound, not slideware

    Practical: what to do the next time a part slips

    Free, 45 minutes, and the recording lands in your inbox either way.

    Save your spot

    Not ready to register? The operating model behind the talk, as a 9-minute read.

    Just-in-sequence parts delivery arriving at an OEM assembly line

    Bring your worst inbound lane.We'll work it live.

    October 8, 2026 · 9:30 AM EST / 3:30 PM CET · 45 minutes + live Q&A

    OrkestraEvolution Time Critical

    Save your spot

    Free · 45 minutes + live Q&A · recording sent to everyone who registers

    Calendar invite and access link arrive instantly. Can't make it live? Register anyway and we'll send the recording.